Duration of the cleaning: 4 days.
Before cleaning | After cleaning | Delta | |
---|---|---|---|
Feed | 821m3/hour | 871m3/hour | +50m3/hour (+6.1%) |
Radiation Cell temperature | 866°C | 736°C | -130°C |
Convection Cell temperature | 357°C | 308°C | -49°C |
Source: Furnace T2F****
Duration of the cleaning: 4 days.
Before cleaning | After cleaning | Delta | |
---|---|---|---|
Radiation Cell1 temperature | 847°C | 667°C | -180°C |
Radiation Cell2 temperature | 842°C | 648°C | -194°C |
Convection Cell3 temperature | 850°C | 639°C | -211°C |
Source: Furnace 40*A, 3 Radiations cells.
Eng. Units | Before cleaning | After cleaning | |
---|---|---|---|
Feed (naphta) | kg/hr | 9 071 | 9 403 |
COT | °C | 825 | 825 |
Fuel gas flow | kg.hr | 1 500 | 1 426 |
Fuel gas pressure | Bar g | 1,60 | 1,33 |
O2 | vol % | 2,62 | 2,54 |
Excess air | % | 1,142 | 1,138 |
Draft | mmH2O | 3,45 | 3,31 |
Fan speed | rpm | 1 550 | 1 400 |
Damper O.P. | % | 106,9 | 100,0 |
Stack temperature | °C | 254 | 205 |
Ambient temperature | °C | 20 | 20 |
Fuel gas net heating value : 12 200 kcal/kg.
Combustion air required : 17,38 kg/kg fuel.
Increasing Aircoolers efficiency from process and economical point of view:
Before cleaning | After cleaning | Delta | |
---|---|---|---|
Tin | 47,9°C | 42,2°C | -5,7°C°C |
Tout | 40,8°C | 37,5°C | -3,3°C |